The mill allegedly let sludge and weeds build up in its wastewater-aeration pond, reducing the volume and ability of the 30-acre open-air pond to handle wastewater before sending it into Port Townsend Bay.
View on Bluesky
Source: at://did:plc:kkf4naxqmweop7dv4l2iqqf5/app.bsky.feed.generator/news-2-0
Author: OPB (@opb.org)
View on Bluesky
Source: at://did:plc:kkf4naxqmweop7dv4l2iqqf5/app.bsky.feed.generator/news-2-0
Author: OPB (@opb.org)